Monday, June 17, 2019

Safety Plant Essay Example | Topics and Well Written Essays - 5000 words

Safety Plant - Essay ExampleIn the 1980s, the platform received an overhaul to allow for natural gun performance, which changed some of the dynamics of its in operation(p) and technological systems. Piper of import was a fixed platform in the North Sea, consisting of four modules that were segregated by a series of firewalls. Two modules were stranded for gas and oil production, with one module for gas compression and a fourth containing platform wellheads. Later analysis indicated that these firewalls were inefficient for the multiple activities occurring on the platform. The stay levels of Piper Alpha contained control way of lifes, helipad operations, and personnel areas (e.g. sleeping quarters and recreational centres). On board were a variety of life rescue boats to facilitate evacuation in the event of emergencies. The events leading to the disaster and occurring during the series of fires were attributed to operational deficiencies, management failures, and process/proced ure dysfunction, making this a complex scenario of human and tangible factors. This hatch highlights the inter-connectivity of these failures as well as discussion of the sweeping pencil eraser and procedural changes that occurred in the industry post-disaster. The events leading to Piper Alpha destruction Piper Alpha maintained two different condensate piths ( cores A and B). A condensate pump is designed to remove excess condensate (water vapour) to facilitate compression and production functions. On the morning of July 6, routine maintenance was scheduled for tenderness A which called for the removal of the pressure safety valve. For reasons unknown, the actual maintenance was delayed and instead of reassembly, Pump A was closed off with a fugacious metal flange and scheduled for lock out. As was part of the Piper Alpha operations and safety processes, a work permit was handwritten by the current technician with information that Pump A should not be turned on due to the temp orary inability to handle pressure loads. Up until this point, the safety and operational processes were in-line with platform practice and expectations. Six hours later, the written permit indicating that Pump A should, under no circumstances, be turned on was somehow misplaced by the next shift working in the operations control room. Unknown to the technician who wrote the permit, there was a supplementary permit already posted that authorized construction overhaul of Pump A in the control room. No verbal exchanges occurred between the technician in charge of Pump A lockout and the control room operators as another problem was being dealt with on the platform at the time (Caplan 2005). Thus, the permit was left hand in the control room and the technician returned to the employee housing area. Earlier in the day, Piper Alpha had been experiencing blockage problems caused by hydrate buildup, a form of ice produced when gas and water molecules form solids under certain temperature a nd pressure conditions (Sheen 1987). This hydrate blockage stopped Pump B and the control room was unable to get the pump back online. The significance of this was that operations of Pump B were inter-connected with every power system on Piper Alpha, therefore there were only a social function of minutes after Pump B ceased production to ensure no power supply disruption. The control room identified an overhaul permit for Pump A, but no indication about the warning of not turning on Pump A since, as previously identified, it had been misplaced. Therefore, the manager of the control room determined that Pump A was an effective

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.